Top Section
Explore Business Standard
Don’t miss the latest developments in business and finance.
Haryana elections: Setback for Chautala clan; Abhay Singh, Dushyant trail
Prime Minister Narendra Modi on Saturday flagged off the Secunderabad-Tirupati Vande Bharat Express train here. PM Modi, who arrived in the city, flagged off the service from Secunderabad Railway station. He boarded the stationary train at the railway station and interacted with school children. The train will reduce the travel time between Secunderabad in Telangana and Tirupati in neighbouring Andhra Pradesh, by almost three and half hours and will be particularly beneficial for pilgrims. On January 15, Modi had virtually flagged off the Vande Bharat train service between Secunderabad and the port city of Visakhapatnam in AP, which was the first such service connecting the two Telugu-speaking states. Telangana Governor Tamilisai Soundararajan, Railways Minister Ashwini Vaishnaw, Union Minister for Culture and Tourism G Kishan Reddy were among those who were present.
A special miniature scale model of 'Vande Bharat', the indigenously designed semi-high speed express train, has been put on display at the Pune-based Joshi's Museum of Miniature Railways to provide information about the train to rail enthusiasts. The 'Vande Bharat' model, designed on '1:100' scale, was unveiled by Pune Guardian Minister Chandrakant Patil during a special visit to the museum on Tuesday as the facility is celebrating 25 years of its existence. Ravi Joshi, who currently runs the museum, said they made the model based on actual drawings from the Indian Railways. "All minute details were taken into consideration while designing this static model. Work is in progress on a working miniature model of 'Vande Bharat', and it will soon be showcased in the museum, he said. It took them three months to design the static model of 'Vande Bharat', Joshi's son Devavrat said. The Vande Bharat trains are currently operational on multiple routes in the country. Patil, while unveilin
During his visit, the Prime Minister will attend the Combined Commanders' Conference-2023 at the Kushabhau Thakre Hall in Bhopal
The Udhampur-Srinagar-Baramulla Rail Link Project (USBRL) will be completed by December 2023 or January 2024 and a Vande Bharat metro train will be operated between Jammu and Srinagar once the project becomes fully operational, Railway Minister Ashwini Vaishnaw said on Sunday. Vaishnaw travelled on the first run of a track-mounted trolley on the world's highest arch bridge constructed on the Chenab river with railway officials and inspected the iconic bridge having a height of 359 metres from the Chenab riverbed. He also performed pooja at the bridge before the inspection. Addressing media persons, the minister announced setting up a special training academy for engineers at Jammu. Speaking on the progress of work, he said the track work on the Chenab bridge has been completed and now electric work will be undertaken, besides the installation of Kavach- an anti-collision safety device. The Chenab bridge was a difficult challenge as the terrain was a highly seismic activity-prone a
The order placed by the Railways is for the supply of seats and interior panels for Vande Bharat trains and "not to manufacture its coaches", a Tata Steel official has clarified. As part of the Rs 225 crore order, Tata Steel will supply light-weight seats for 23 coaches of Vande Bharat rails and fibre-reinforced polymer composites-based interior panels for 16 coaches of the high-speed train, Debashish Bhattacharjee, Vice President (VP) - Technology & New Materials Business of Tata Steel, told PTI. Some sections of the media have reported that Tata Steel has bagged orders for manufacturing coaches of Vande Bharat trains, which is "incorrect and baseless. We have not received the order to manufacture its coaches," he said. "Tata Steel has bagged the seats and interior panels order through a competitive bidding process executed by the national transporter (the Railways). We appeared as L1 for the prestigious order," he said, adding that the value of the order is Rs 225 crore. The ...
A parliamentary standing committee on Railways has raised concern over the pace of production of Vande Bharat trains and said that in 2022-23, only eight rakes have been manufactured till now against the target of 35 for the year. The fourteenth report of the Standing Committee on Railways headed by BJP MP Radha Mohan Singh, in its 14th report on the demand for grants, has asked that the Railways need to intensify efforts for the production of Vande Bharat rakes/coaches to meet the aspirations of rail commuters. "The Committee while expressing their concern to find that out of 35 rakes of Vande Bharat planned for the year 2022-23, only 08 rakes have been turned out till date, are of the view that with this pace of production, the Railways may find it difficult to achieve their set target," the report, which was tabled in both Houses of Parliament on Monday, said. The Committee also noted that during the budget speech of 2022-23, the finance minister had announced 400 Vande Bharat ..
A Vande Bharat semi-high speed express train will be operated on the Mumbai-Goa route soon, Union Minister of State for Railways Raosaheb Danve has informed a delegation of legislators from Maharashtra. This information was shared by Niranjan Davkhare, a member of the Maharashtra Legislative Council representing the Konkan graduates constituency. The delegation of legislators met Danve on Friday. During the meeting, the Union minister told the group that a Vande Bharat Express train will be operated between Mumbai and Goa, Davkhare said in a release. This express train will be operated between Mumbai and Goa on the lines of the ones introduced recently on Mumbai-Shirdi and Mumbai-Solapur routes to curtail travel time, Danve said. The electrification of the Mumbai-Goa railway route has been completed and the new train service will be introduced following an inspection, the minister told the delegation. The delegation discussed several issues concerning railways in Thane and Konkan
The technical bids were opened on Thursday and financial bids are expected to be invited soon
Titagarh Wagons Ltd (TWL) on Wednesday said the consortium it set up with Bharat Heavy Electricals Limited (BHEL) is the sole fully Indian entity among the five bidders for the Rs 72,000 crore Vande Bharat trains contract. TWL, the engineering and wagon major, also said it has lined up Rs 700 crore capex over the next 4-5 years to ramp up its production capacity and related infrastructure. The upcoming steel body facility at Uttarpara in West Bengal will strengthen TWL's coach-building capabilities in both aluminium and steel bodies, a senior company official said. "The company after forming a consortium with BHEL is one out of five bidders for Vande Bharat. We remain optimistic. We are the only truly Indian consortium as both partners are Indians," TWL director (marketing & business development) Prithish Chowdhary told PTI in a telephonic interview. The other bidders are German-based Siemens with BEML, Medha Engineering with Swiss company Stadler Rail, Russian Transmashholding ...
300 Vande metros, 1000 8-coach Vande Bharats, hydrogen trains in the works
Four major domestic and foreign companies have come forward for the production, officials said
The eighth Vande Bharat train in the country will run between Secunderabad and Visakhapatnam in approximately eight hours
Telangana BJP president Bandi Sanjay said that the revised schedule of Modi's visit will be announced soon
The train will have intermediate halts in Warangal, Khammam, Vijayawada and Rajahmundry
According to the Railway Ministry, vibration tests of the new train are underway at a speed of 115 km per hour to 180 km per hour
Prime Minister Narendra Modi on Sunday flagged off the Vande Bharat Express train here connecting Nagpur to Bilaspur. The flagging off ceremony took place at the Nagpur railway station. During the event, PM Modi also laid the foundation stone for redevelopment of Nagpur and Ajni railway stations to be redeveloped at a cost of about Rs 590 crore and Rs 360 crore respectively. He also dedicated to the nation the Government Maintenance Depot (locomotive maintenance depot) at Ajni in the city and Kohli-Narkher section of the Nagpur-Itarsi third line project. These projects have been developed at a cost of about Rs 110 crore and about Rs 450 crore respectively.
What does e-rupee mean for you? Who's the brain behind Vande Bharat? Is it time to shift to private bank stocks? What are Alternative Investment Funds? All answers here
Ministry of Railways has floated a tender for manufacturing 200 new rakes of new-generation Vande Bharat trains
At least 4 of the five bidders have formed JVs for the Rs 26,000-crore order