The Green Hydrogen Plant is designed for an electrolyser capacity of 800 kW comprising both Alkaline (380 kW) and PEM (420 kW) technologies and will be powered by a rooftop solar plant of 990kW peak DC capacity and a 500kWh Battery Energy Storage System (BESS). As part of the first phase of the project 380 kW Alkaline electrolyser has been installed, while the 420 kW PEM electrolyser along with solar plant capacity augmentation to 1.6 MW peak DC, will be part of future expansion.
Powered by Capital Market - Live News
Disclaimer: No Business Standard Journalist was involved in creation of this content