Top Section
Explore Business Standard
Don’t miss the latest developments in business and finance.
Several vehicles were stuck on the old National Highway 6, which connects Kolkata to Mumbai, after an organisation of the Kudmi community started a blockade in West Bengal's Paschim Medinipur district on Tuesday, demanding that they be given ST status. West Bengal Kudmi Samaj started the blockade around 6 am at Khemashuli in the Kharagpur local police station area, officials said. "The blockade will continue until our demands are met," said Tapas Mahato, a leader of the organisation. Hundreds of vehicles were stranded on the road because of the blockade, triggering massive traffic snarls even on the other adjoining roads in Paschim Medinipur and Jhargram districts. Till the last report was received around 11 pm, the blockade was continuing. Drivers of the stranded vehicles said they were facing scarcity of food and water. Some of the vehicles were being diverted through Balibhasha in Jhargram to bypass the blockade, officials said. Kudmis are at present classified as OBCs.
Union minister Nitin Gadkari on Thursday said the ongoing work on the Mumbai-Goa national highway will get over by December this year, which would cut the travel time between these places to four-and-a-half hours and give a huge boost to development in Maharashtra's Konkan region. He was speaking to reporters at Ratnagiri, around 340 km from here. "The Mumbai to Goa highway stretch has been divided into 10 packages (phases) and road construction activity in all packages, except two, is almost over. Most of the pending construction work on the road and one tunnel will be completed by December this year," the Minister of Road Transport and Highways said. "By December, the entire stretch will be available for vehicular movement and the distance can be completed in four-and-a-half hours," he said. Gadkari said he has instructed the officials to conduct road safety audits and put international standard signages for the drivers on the Mumbai-Goa highway. With the help of local education
Union Minister Nitin Gadkari on Thursday said the work on the Mumbai-Goa highway will be completed by December this year, which would give a huge boost to development in Maharashtra's Konkan region. He was speaking at the 'bhoomi pujan' ceremony in Panvel of the concretisation of the Palaspe-Indupur national highway stretch and some other routes. The Union Minister of Road Transport and Highways several works in the state's Konkan region were help up due to issues like land acquisition, permissions, contractor problems. He also announced the construction of the Rs 13,000 crore Morbe-Karanjade road, which will go through Jawaharlal Nehru Port and reduce the time needed to cover the distance between Mumbai and Delhi to 12 hours. Work on the Rs 1,200 crore Kalamboli junction and Rs 1,2000 Pagode junction too will begin soon, he said. He said the much-delayed Mumbai-Goa national highway work will be completed by December this year, which will hugely boost development prospects of the
The 434-km strategic Srinagar-Leh national highway was reopened for vehicular traffic on Thursday in a record time of 68 days after its closure in January this year following heavy snowfall, officials said. A trial movement was conducted successfully and the decision to reopen the road for civilian traffic will be taken after a joint inspection by the civil administrations of the Union Territories of Ladakh and Jammu and Kashmir. The highway was thrown open for traffic at the Zojila Pass, situated at an altitude of 11,650 feet, by Director General of Border Roads Organisation (BRO) Lt Gen Rajeev Chaudhary. Zojila is a strategic pass that provides a vital link between Kashmir Valley and Ladakh, and it is key to operational preparedness of the armed forces. It used to remain closed for about six months due to heavy snowfall. However, over the last few years, the BRO has been reopening it in less time. This year, it was cleared off in record time of 68 days. Speaking to reporters, Lt
One person died and 41 were injured in a bus accident today on Manali Chandigarh National Highway in Jabli near Bilaspur district headquarters, police said
Union minister Nitin Gadkari on Friday approved the development of a 32-kilometre highway from Chandrasekharapuram to Polavaram in Andhra Pradesh with an investment of Rs 1,292.65 crore under the Bharatmala project. The six-lane greenfield highway project on the Bengaluru-Vijayawada economic corridor will be developed on hybrid annuity model (HAM), according to an official statement. Under the hybrid annuity model, 40 per cent of the project cost is provided by the government during the construction period and the balance 60 per cent as annuity payments over the operations period along with interest thereon to the concessionaire. "Union Minister for Road Transport and Highways Shri Nitin Gadkari approved Rs 1,292.65 crore under Bharatmala Pariyojana for the development of 32.00 Km long 6-lane access controlled greenfield highway from Chandrasekharapuram to Polavaram on (NH-544G) BengaluruVijayawada Economic Corridor in hybrid annuity mode in Andhra Pradesh," the Ministry of Road ...
Landslide damaged nine houses and a cowshed on the Srinagar-Leh highway, said officials on Monday, adding that there was no loss of life
Authority plans to slash developer upfront payment, reduce timeline for financial closure
More than 5,100 trees will be felled in Delhi for the construction of the six-lane Delhi-Saharanpur highway by the National Highways Authority of India (NHAI), according to official documents. A total of 9.58 hectares of deemed forest land in Delhi having 5,104 trees has been diverted for the construction of the 14.75-kilometre stretch of the highway. The tree species include Sheesham, Sahtut, Peepal, Champa, Ashok, Subabul, Neem, Eucalyptus, Kikar, Ber, Jamun and Gular. According to the Deputy Conservator of Forest (Central), all the 5,104 trees on the deemed forest land will be felled and compensatory afforestation will be raised at NTPC Eco Park, Badarpur at a cost of Rs 8.66 crore. The Delhi portion of the Delhi-Saharanpur highway extends from the Akshardham NH-9 junction to the city's border with Uttar Pradesh. The project is part of the first phase of Bharatmala Pariyojana, the second-largest highway construction programme in the country under which 50,000 km of roads will b
Contract for the project, which connects with Mata Vaishno Devi shrine, allowed the firm to collect a semi-annual sum for 20 years
The 1224-km highway is being developed at a cost of Rs 26,000 for the Bharatmala programme.
The target is ambitious as the ministry in 2021-22 set a 40-km per day construction goal, but later revised it down.
Plan outlay set at Rs 100 trillion for multi-modal connectivity; 16 ministries to work on integrated infra development, including railways, roads, oil and gas, power, telecom, shipping and aviation
Sixty per cent of black spots on national highways in India where more than 28,000 killings took place in road crashes in a period of three years have been rectified now, according to official data.
Violence between police and protesting farmers in Haryana broke out on Saturday with former trying to reach Karnal city to protest against a state-level BJP meeting chaired by CM Khattar
The National Green Tribunal Tuesday directed the Haryana State Pollution Control Board to submit a report on steps taken to control overflow of sewage on the stretch of DelhiAgra highway
The Supreme Court directed the Central government to undertake plantation activities to compensate for the loss of forest area due to the construction of Char Dham national highway in Uttarakhand
The traffic projections would be for certain time periods starting from five, 10, 15 years, and onwards
Vehicles were running bumper to bumper and a long line of cars was visible for several kilometers on both sides of the highway
The proposed 1400-km long highway would connect Moreh in Manipur to Mae Sot in Thailand via Myanmar