NASA began fuelling its new moon rocket early Monday for liftoff on a test flight to put a crew capsule into lunar orbit for the first time in 50 years.
Thunderstorms delayed the fuelling operation by an hour. The threat of lightning diminished enough to allow the launch team to proceed with loading the rocket's tanks. But it was uncertain how much the stalled work might shorten the two-hour launch window.
No one was inside the Orion capsule atop the 322-foot (98-meter) rocket at Kennedy Space Center. Instead, three test dummies were strapped in for the lunar-orbiting mission, expected to last six weeks.
It's the most powerful rocket ever built by NASA, out-muscling the Saturn V that carried astronauts to the moon a half-century ago. Thousands of people jammed the coast to see the Space Launch System, or SLS, rocket soar.
Rain pelted the launch site as the launch team finally began loading more than 1 million gallons of super-cold fuel into the rocket. Forecasters remained optimistic the sky would clear by launch time later in the morning; the rocket is banned from flying through rain.
Besides the weather, launch director Charlie Blackwell-Thompson and her team were dealing with a communication issue involving the Orion capsule.
Engineers scrambled to understand an 11-minute delay in the communication lines between Launch Control and Orion that cropped up late Sunday. Although the problem had cleared by Monday morning, NASA needed to know why it occurred before committing to launch.
The launch team was also wary of any lingering fuel leaks. A pair of countdown tests earlier this year uncovered not only leaks but other technical trouble. NASA officials said they could not be sure about the repairs until the final phase of the countdown.
This first flight of NASA's 21st-century moon-exploration program, named Artemis after Apollo's mythological twin sister, is years overdue. Repeated delays have led to billions in budget overruns; this demo alone costs USD 4.1 billion.
Assuming the test goes well, astronauts would climb aboard for the second flight and fly around the moon and back as soon as 2024. A two-person lunar landing could follow by the end of 2025. NASA is targeting the moon's south pole.
During Apollo, 12 astronauts landed on the moon from 1969 through 1972, with stays of no more than a few days. NASA is looking to establish a lunar base during Artemis, with astronauts rotating in and out for weeks at a time. The next step would be Mars, possibly in the late 2030s or early 2040s.
(Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)
You’ve hit your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Quarterly Starter
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Access to Exclusive Premium Stories Online
Over 30 behind the paywall stories daily, handpicked by our editors for subscribers


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app