Himachal: Atal Tunnel witnesses 60% increase in vehicular traffic in 2022

The maximum monthly traffic was registered in the months of June, December and May (in descending order), ie 2,25045, 2,02,974 and 2,11,824 respectively

Atal Tunnel
Named after former Prime Minister Atal Bihari Vajpayee, the 9.02-km tunnel is the longest highway tunnel in the world. It connects Manali to Lahaul-Spiti Valley ensuring movement throughout the year.
ANI General News
2 min read Last Updated : Jan 03 2023 | 7:28 AM IST

Approximately 6,22,988 vehicles entered through Atal Tunnel Rohtang (ATR) in Lahaul valley in the year 2022 and around 6,50,711 vehicles exited through ATR, which is 12,73,699 vehicles in total during the year, said Lahaul and Spiti Police.

It is far more than the traffic transit through ATR in the year 2021, which was around 3,76,870 vehicles that had entered the district and around 4,23,071 vehicles exited through ATR, which was 7,99,941 vehicles in total, said police.

Therefore, there has been an increase of approximately 4.73 lakh vehicles compared to the previous year. This is an approximate 60 per cent increase from the vehicular traffic number recorded the previous year.

The maximum monthly traffic was registered in the months of June, December and May (in descending order), ie 2,25045, 2,02,974 and 2,11,824 respectively. The maximum traffic recorded for a single day was on December 26, 2022, which was 19,383. This is also the highest number for any day since Prime Minister Narendra Modi inaugurated Atal Tunnel Rohtang.

A total of 16 days in the past year saw traffic of over 10,000 crossing the tunnel, with December having 6 such days. The district has faced a huge traffic influx since the opening of Atal Tunnel Rohtang, which is increasing day by day gradually, said district police.

Prime Minister Narendra Modi inaugurated the Atal Tunnel in Rohtang on October 3, 2020.

Named after former Prime Minister Atal Bihari Vajpayee, the 9.02-km tunnel is the longest highway tunnel in the world. It connects Manali to Lahaul-Spiti Valley ensuring movement throughout the year.

Earlier, the Valley was cut off for about six months each year owing to heavy snowfall.

The tunnel reduces the road distance by 46 kilometres between Manali and Leh and the time by about four to five hours.

The tunnel is built with ultra-modern specifications in the Pir Panjal range of Himalayas at an altitude of 3,000 metres (10,000 feet) from the Mean Sea Level (MSL).

(Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)

Subscribe to Business Standard digital and get complimentary access to The New York Times

Quarterly Starter

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

Save 46%

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Access to Exclusive Premium Stories Online

  • Over 30 behind the paywall stories daily, handpicked by our editors for subscribers

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

Topics :Himachal PradeshTraffic

First Published: Jan 03 2023 | 7:28 AM IST

Next Story