Hike in port duty, evacuation and grid connection delays, unresolved anti-dumping duty issues to drag pace of installation
According to the survey by Mercom Capital, with the addition of 2,247 Mw, the cumulative installed capacity between January-Spetember 2017 stands at 7,149 Mw.