Waaree Renewable Technologies on Wednesday said it has bagged an order to build a 221.8 MWp solar power project from a steel maker. "We have received a Letter of Award (LoA) from one of India's leading steel manufacturing companies for the execution of Engineering, Procurement and Construction (EPC) works of a solar power project of 221.8 MWp DC capacity," it said in a BSE filing. The order is placed by a renewable energy arm of one of India's leading steel manufacturing companies. The project is likely to be completed in FY 2023-24, as per the terms of the contract. Waaree Renewable did not disclose the financial details of the project.
In India, no company manufactures polysilicon, which is raw material in solar equipment manufacturing
Longer sunnier days have ensured that the performance of solar power farms improved to 75 per cent in the current fiscal from 59 per cent in the year-ago period, according to a report. Rating agency Crisil has prepared the report based on the performance of 115 solar projects aggregating to 4.6 GW of power generation and those having an operational record of at least one full year. As per the report, 75 per cent of these projects reached P90 level of generation in the current financial year compared to only 59 per cent in the year-ago period. P90 generation estimate indicates generation that is likely to happen with 90 per cent confidence during the project's tenure annually. For example, a P90 value of 10,000 kWh for the annual output implies that it will generate over 10,000 kWh power for 90 per cent of the time. The performance on the P90 metric is crucial as it is used widely to estimate the cash flow cushion available for debt servicing. A project's future cash flow are estim
Tata Power Renewable Energy Ltd (TPREL) on Tuesday said it has received a letter of award from MSEDCL to set up a 200 MW solar project in Solapur, Maharashtra. The letter of award has been received from the Maharashtra State Electricity Distribution Company Limited (MSEDCL). The project will be commissioned within 18 months from the PPA (Power Purchase Agreement) execution date. The project was awarded through competitive bidding, followed by a reverse e-auction, TPREL said in a statement. The installation will reduce around 432.94 million kg of CO2 emissions annually and will be one of the most substantial solar PV projects. "We have a current countrywide portfolio of more than 6.5 GW (gigawatt). This project will further strengthen our position as a leader in providing clean and reliable power in the state for years to come," Ashish Khanna, CEO of TPREL, said. TPREL is a wholly-owned subsidiary of Tata Power.
"I am happy to announce that we will continue our investments and we will invest in 10 Gw of renewable solar energy in AP," said Ambani.
Prime Minister Narendra Modi will inaugurate the mega G20 event, which will witness the record participation of more than 600 exhibitors from across the globe
Indian company has a portfolio of solar power projects in five states
Agriculture Commissioner Kanaram said farmers were subsidised up to 60 per cent of the cost of setting up a solar-energy pump
This project will reduce the financial burden of the electricity bills of respective departments by approximately 40 to 50%
The investment buzz for the transition has begun but policy frameworks still lag the process
Solar equipment maker Waaree on Tuesday said it will ramp up its module manufacturing capacity to 12 GW by March 2023 from the existing nine GW. Waaree, a leading solar panel manufacturer, currently, has a 9 GW module manufacturing facility operational. Further, the company is setting up additional module manufacturing capacity, which will take its module manufacturing capacity to 12 GW for a 650-watt module by March 2023, a company statement. This will be the largest module manufacturing capacity in the world outside China, it added. Waaree is the lone manufacturer in India approved by ALMM (Approved List of Models and Manufacturers) to ship high-wattage panels -- 650WP along with 600WP and 540WP -- from its manufacturing facilities in Surat, Chikhli, Tumb and Nandigram. With the addition of Indo solar, modules will be made at Greater Noida in NCR for the domestic market in Q3 of 2022, the company said. Waaree has emerged as the leading supplier of solar modules as per a report b
Ramgarh, Dec 16 (IANS/ 101 Reporters) Kanija Fatma (40) and her husband Riyamuddin Ansari work as tailors in minority-dominated Maganpur village in Ramgarh district of Jharkhand in eastern India
There is a 925-Mw park and a 750-Mw park in Jaisalmer district
Discoms not looking at signing agreement for procuring power at such high tariffs, says senior executive of French utility's unit
The world's decarbonisation journey will trigger a massive demand for investments
Zetwerk's acquisition of Unimacts will provide the company with immediate access to marquee solar and wind-power customers
Indore Municipal Corp. seeks to raise as much as 2.6 billion rupees ($31.8 million) via a 10-year bond sale next month
The organization had installed renewable capacity of 142 megawatts of rooftop solar and 103.4 megawatts of wind energy as of August
The state-run Solar Energy Corp. of India is seeking bids from solar manufacturers for 195 billion rupees of financial incentives, according to documents published on the agency's website
Japan saw the second-highest impact, with $5.6 billion in avoided fuel costs thanks to solar power generation alone